February 26, 2010

TechTarget’s New Office


For my friends and co-workers at TechTarget, here is a preview of what you’ll be walking into on Monday morning.

no images were found

1. Reception Desk and Central Stairway.

I defied the company directive to “work at home” this friday and went to Riverside to get a few shots of the completed construction. I wanted to get there before the clutter of bright orange moving crates and throngs of employees cluttered the space.

My only disappointment was that the space was not as clean as I had hoped it would be. Understandable, since the construction crew was in “punch list” mode. Painters were completing the trim work and touching up walls, furniture installers were installing furniture, electricians were buttoning a few things up. It was pretty hectic.

All of the trappings of  TechTarget employment were being put into place as well. The vending machines were in place in the break rooms, the coolers were being filled with the familiar Coke products and three of four stainless steel refrigerators grace the primary break area. Everything is top notch.

A couple of more images below:

no images were found

2. A closer view of the reception desk

no images were found

3. Central Stairway, from the first floor looking up.

no images were found

4. Central Stairway, from the third floor looking down.

Share This Post

Subscribe to Posts

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.